• English
  • Suomi
  • Svenska
  • Diamond Wire Sawing for Heavy Infrastructure Projects

    At some point on every major rock or concrete project, there is a section where blasting or hammering is excluded, vibration limits are tight, or geometry has to be exact — and the standard methods simply cannot deliver.

    That section is our territory.

    Trosscut Europe has resolved exactly these situations for main contractors across Northern Europe since 2002 — 24+ years, 100% project success rate, zero failed programmes.

    Priit Purde, owner of Trosscut.com, performing wire sawing and diamond drilling on construction site

    WHEN CONTRACTORS CALL US

    • Blasting excluded — urban site, railway or sensitive neighbour
    • Vibration monitoring near its limit — stop-work risk
    • Geometry must be exact — overbreak is not acceptable
    • Shaft or tunnel bottleneck threatening your programme
    • Heavily reinforced concrete — standard saws underpowered

    WHAT YOU GET WHEN YOU CALL US

    • Owner-operator on site — Priit Purde leads every job personally
    • Mobilisation 5-7 days — equipment in SE, FI, EE
    • Documentation day one — method statement, risk assessment
    • Works in live environments — Helsinki, Gothenburg, Stockholm
    • Invoicing SE · FI · EE — local VAT
    • Quote in 24 hours — send drawings

    TECHNICAL SCOPE

    Diamond Wire Sawing — Rock & Concrete

    All materials incl. heavy rebar. Up to 2000 m² in one continuous cut. 5 wire saw units.

    Vertical & Horizontal Shafts

    Shafts to 50 m depth. Blind cuts to 50 m. Tunnel portals. Any geometry.

    DTH Rock Drilling

    Ø95-254 mm · up to 100 m depth · any angle · granite and limestone

    Marine & Heavy Concrete

    Quay slabs, bridge beams, industrial foundations. No shutdown of surrounding operations.

    PROJECTS COMPLETED

    Stockholm — 47 m shaft — world’s deepest wire-sawn shaft — exact geometry, zero overbreak

    Helsinki Olympic Stadium — 2500 m² — zero disruption

    Gothenburg Harbour Quay — 200 m — on time, port never stopped

    LKAB Iron Ore Silo — Norrbotten — full programme delivered on spec

    Turku — 1000 m² — faster than planned, minimal overbreak

    WHERE WE OPERATE — Call us within 24h

    Sweden · Finland · Norway · Estonia
    📞 +372 513 4890 | ✉ info@trosscut.com | 🌐 www.trosscut.com
    Trosscut Europe OÜ · SE: SE502081-6202 · FI: FI2736453-3 · EE: 12473301